Skip to main content
Image

"We thought that we would be done in July of 2023. In March we got everything closed in, got the wiring done, all the windows in, and all of the cabinets delivered for the kitchen and the bathrooms,” shared Barb Loughran. “Just as it was getting there, we had a major fire and the house was 100% smoke damaged, so there was black everywhere. Inside had 100% water damage and half the house was burnt. 15 more minutes and the whole thing would have gone up.” Read more about this Adirondack home here.

Partners:

Architect: Balzer and Tuck Architecture
Builder: Doug McCall Construction – North Creek
Timber Frame: New Energy Works
Photography: Michael Martineau

 

Follow Us On Instagram